현장투입 순서

  • 제작공정
  • 현장투입 순서
  • 컨설팅/견적문의
  • 주문절차 안내
시공계획 수립→공급장치 설치→현장반입→B/P 투입 및 혼합→타설
Establishment of construction plan Pre-planning for delivery, process, safety management and etc.
Installation of supply system Installation of supply system, allocation, scheduling for raw material input in line with construction plan Supply system
Supply system
공급장치 설치
Delivery to the field Delivery according to the plan and inspection of loaded material 현장반입
Adding and mixing of B/P Addition of Steel Fiber into B/P in the field or a concrete mixer B/P through supply system
Adding Steel Fiber with measure according to designed volume
Checking existence of Fiber Balling
B/P 투입 및 혼합
Placing of concrete Placing of Steel Fiber-Reinforced Concrete 타설


Package unit 1,000kg(1Ton), 500kg, 20kg(test) 포장방법